A virtual pipeline for data centers

Don't wait on the grid.

Your project is ready. Your pipeline isn't. REV delivers LNG or CNG to your site, so your data center runs now and connects to the pipeline when it arrives.

A REV LNG tractor and LNG trailers staged at a REV yard
REV-owned equipment. REV crews.
41M+
gallons of LNG and CNG delivered
41
states operated in, plus Canada
10M+
safe miles on equipment we own and maintain
2012
founded in Victor, New York
The problem with data centers

A data center goes up in months. The power to run it can take years.

A developer can have the land, the air permit, the turbines, and a tenant ready to move in, and the data center still sits dark, waiting on a pipeline connection. The wait is optional.

Waiting on the grid
3–7 years
On-site power, gas by pipeline
12–18 months
With REV: on-site power, gas delivered
2–4 months
01
Every dark day costs money.
Capital that isn't earning, a tenant who isn't paying, and on some projects a penalty for every day the data center is late.
02
REV brings the gas.
The day your equipment is ready, REV delivers LNG or CNG to the site, and the turbines you already bought start running.
03
Your data center starts earning.
It processes data up to a year sooner, the capital starts earning, and the penalty clock stops. When the pipeline arrives, it's an upgrade, not a rescue.
04
REV has done this for fourteen years.
More than 41 million gallons of LNG and CNG across 41 states and Canada, under must-serve contracts in the harshest conditions.

The hardest question a developer asks us isn't about the land. It's 'when can I turn it on?' For years the honest answer depended on a pipeline schedule neither of us controlled. With REV, a site we bring to market comes with a way to get gas while that schedule plays out.

Brian Patten, Founder and CEO, Next Generation Land Company
REV LNG trailers, vaporization skid and generators on a remote site in New Mexico
REV-owned kit, REV crews. Storage, conditioning, 24/7 dispatch.
The virtual pipeline

Gas on site the day your equipment is ready.

LNG or CNG delivered to your site, stored and conditioned on REV equipment, feeding your turbines or engines until the pipeline or grid arrives. Tell us five things and we'll tell you what arrives, and when. Then do exactly that.

  • Fuel agnostic
    LNG or CNG, whichever your site and schedule call for. Source and phase agnostic: there's no project site REV can't fuel.
  • Start. Permit. Grow.
    A footprint that grows with the site. Commissioning, bridge, phased construction, or emergency. Short-term or multi-year.
  • Site layout, ready
    NFPA 59A setbacks, ready for your EPC on the first call.
  • Development-minded
    Twelve-plus years developing infrastructure: site plans, conceptual to final permits, local authorities and first responders, before the first delivery.
What we stand for

Proven in the harshest conditions.

REV has spent fourteen years getting gas where pipelines can't, under must-serve contracts in the harshest conditions, from the New Mexico desert to the Louisiana bayou to northern Minnesota. A data center site gets the same crews, the same equipment, and the same safety culture, every shift.

Safety. Reliability. Execution.
  • Safety before anything
    Daily toolbox talks, every shift, every site.
  • Reliability
    10M+ safe miles on equipment we own and maintain.
  • Execution
    24/7 dispatch and field response on every project.
  • We find a way
    Decisions live in-house. A proposal in days, not months.
How it works

Tell us five things. We'll tell you what arrives, and when.

01
Scope
ZIP code, flow rate, pressure, duration, who to call. Two minutes. An engineer calls within one business day.
02
Proposal
Indicative proposal and site layout with setbacks, in days.
03
Run
Gas on site on your equipment date. REV crews run it. Connect when the pipeline lands.
Scope your site Two minutes. Five questions.
Need the land too?

Next Generation Land Company brings power-ready sites and endorses REV as the bridge. A site from NGLC comes with a path to gas while the permanent connection is built.

Scope your site

Tell us five things. Get a proposal.

One question at a time. Best guesses are fine.

Sooner? Call us: (585) 662-5738

  1. 01A REV engineer calls within one business day.
  2. 02Indicative proposal and site layout.
  3. 03First delivery on your equipment date.
Scope your site · 1 of 6

01 · Your site

What's the site's ZIP code?

The nearest town's ZIP is fine. It sets delivery to your site.

We need a five-digit ZIP to work out delivery to your site.

press Enter ↵
02 · Gas flow rate

How much gas will the site burn?

Peak, in MW of generation or MMBtu per day. A best guess is fine. We size the supply from it.

A rough number is enough. We need something to size against.

press Enter ↵
03 · Gas pressure

What pressure do you need gas delivered at?

In psig. Not sure? Skip it and we'll ask your technical contact.

press Enter ↵
04 · Project duration

How long until the pipeline lands?

How many months the bridge needs to run, and your best guess at the pipeline or grid date.

A rough duration in months is enough.

press Enter ↵
05 · Technical contact

Who should the engineer call?

The person who can talk flow rates and setbacks. Phone is optional.

We need a name and company to call.

press Enter ↵
06 · Last one

Where should the proposal go?

Your work email. The indicative proposal and site layout land here.

We need a work email to send the proposal to.

That didn't send. Try again, or call us.

Goes straight to REV's commercial team. No newsletter, no sequence. Nothing else happens with it.

Sent to REV

Thanks. A REV engineer will call within one business day.

We'll come to the call with delivery to your location already worked out, and an indicative proposal behind it.